All Issue

2012 Vol.54, Issue 3 Preview Page
2012. pp. 103–111
Abstract
Works for dam heightening plan have dual purposes: flood disaster prevention by securing additional storage volume and river ecosystem conservation by supplying stream maintenance flow. Now, the dam heightening project is in progress and there are 93 dam heightened reservoir. After the dam heightening project, 2.2 hundred million ton of flood control volume in reservoirs will be secured. Thus it is necessary to evaluate the effects of the dam heightening project on watershed hydrology and stream hydraulics, and resulting flood damages. This study was aimed to assess the impact of outflow from the dam heightened reservoir group on the Whangryong river design flood. The HEC-HMS (Hydrologic Engineering Center-Hydrologic Modeling System) model was used for estimating flood discharge, while HEC-5 (Hydrologic Engineering Center-5) was used for reservoir routing. This study analysed flood reduction effect on 100yr and 200yr return periods about the before and after heightening of agricultural dams. Based on the results of this study, the reduction of flood peak discharge at downstream of the reservoir group was estimated to be about 41% and 53% for 100yr and 200yr frequencies, respectively.
References
Sorry, not available.
Click the PDF button.
Information
  • Publisher :The Korean Society of Agricultural Engineers
  • Publisher(Ko) :한국농공학회
  • Journal Title :Journal of Korean Society of Agricultural Engineers
  • Journal Title(Ko) :한국농공학회논문집
  • Volume : 54
  • No :3
  • Pages :103–111